Share
twitterlinkedinfacebook
Image 1 of 1
FCR00715KEN.jpg
The Sondu/Miriu Hydropower Project (SMHPP), which was developed by KenGen and has an average annual energy production of 330 GWh. Unlike other Hydropower projects in Kenya, SMHPP does not have a major dam and associated large reservoir, but relies on the flow of the river with only a small storage capacity at the intake, thus reducing the environmental impact.